Day: July 6, 2011

Packing Day

The movers came today to pack everything into boxes, now our house is full of boxes. Someone else came to disassemble the gym equipment. We had Indian takeout for dinner with the two packing people as our last dinner on our last night on Vashon with a beautiful view of Mt Rainier.

20110706-103011.jpg

Move-in week has begun

They’ve got just a few more days until we move in. Paint touch-up is being done and the painters have begun the exterior trim painting. Kurt and Tim are finishing the base shoe trim on the staircase. Colin framed the theater cabinetry. Erich was cleaning the cross-ties in the attic. Ryan was installing more door hardware. I did a little more trim-out of the low-voltage work. DirecTV installed the satellite dish. Bill called in sick Tuesday (July 4th hangover?) but he has some light fixtures to install this week and finish up some electrical trim-out. The stone guys were doing something, not sure what. The replacement beverage fridge arrived today. And the cleaners arrived and started cleaning the living spaces for us.

Continue reading “Move-in week has begun”